If you would like us to contact you with more details on the services we offer, please use our Contact Form and we will get back in touch as soon as possible.


Some current and completed projects

  • Ameys Bedfordshire in conjunction with Aggregate Industries
  • Ringways Hertfordshire Contract
  • Woodside Link M1 Dunstable Balfour Beatty
  • A47 Thorney Toll (road recon) Birse
  • A421-M1 J13 Balfour Beatty (All kerbing and grasscrete)
  • A6 realignment and Wixams Village infrastructure (All Civils) Carillion
  • B1117 Stowmarket Relief Road (Kerbing, ducting and paving) Birse
  • Loves farm St neots infrastructure (All Civils) Carillion
  • Ridgemont Bypass (All Civils)
  • Completed large percentage of Target Cost And Schedule of Rates Works in the Hertfordshire Highways/ Amey Lafarge Contract.

We are currently working with the following Main Contractors:-

  • Balfour Beatty
  • Aggregate Industries
  • Toppesfield
  • Ringways 
  • Lafarge
  • Carillion
  • Osbournes
  • Tarmac
  • BSG 
  • Fm Conway
  • Henry construction

           

Customer Testimonials

“We have been using Green Valley now for around 2 years on the Bedfordshire contract and i must say that the overall impression is excellent. I have never had a problem contacting them or arranging meetings at what ever time of day. The workforce are a real credit with a friendly can do attitude. We have had positive comments from residents where they have been working about the friendly and helpful nature of the workforce. The production levels are extremely high but quality is never compromised. All the staff including the supervisors and managers are extremely knowledgeable and are always happy to suggest better ways of working or completing tasks but are also flexible when asked to do something a specific way. I intend to continue using them for the foreseeable future.”

Jason Hackett

Structural Maintenance Site Manager-Bedfordshire Highways


"I have dealt with Green Valley Construction, on behalf of Aggregate Industries UK Ltd, for many years and found their work to be of a high quality, with staff readily made available to deal with emergencies and work required to be done at short notice. I have had very few major queries as their office is always accessible to sort any queries long before they become a serious problem.
I would have no hesitation to recommend Green Valley Construction to any other company requiring their skills."

Terry Manning

Aggregate Industries QS.


"I can confirm that I have been utilising Green Valley Construction (GVC) in the following areas;

  • Footway reconstruction
  • New kerb line installations
  • Carriageway resurfacing
  • Table top installation
  • Signpost schemes
  • Island construction
  • Traffic Management
  • Drainage

GVC have been undertaking highways works for me since March 2015 whilst working as a site manager for Amey. I was extremely impressed with the quality of their workmanship in all the above areas. Furthermore their commitment to given timescales is always spot on and their work force are extremely polite out in the public domain. I would not hesitate to use them on any further projects that come my way."

Ian Lemmon
Site Manager


"This was a difficult and complicated scheme to programme, the time scale to undertake the works was rather compressed and it was all or nothing to get the scheme in in one hit. No extensions were possible and no half measures.

I was incredibly impressed with Kevin and all the GVC men on site. There were many gangs all working very hard on different bits, but all heading for the same coordinated goal. The men were all very hard working, but at the same time looking out for, and courteous to any pedestrians that required assistance, the emergency services, and myself and Piotr while we were setting out the works.

Everything that they set out to was achieved and the site was opened to traffic 12 hours early. That in itself would have been impressive, had it not been for the fact that the start had been delayed form Friday night to Saturday morning due to a NRSWA clash. Their attention to detail and thought put into the work was very good and exceeded my expectations - I know what to expect as normal service now though! An example of this I found while checking the site before opening to traffic after everyone had left site. The traffic island nearest McDonalds that I thought would have been barriered off and inaccessible to pedestrians was the opposite. The kerbs and approached were all ramped in black, all routes through the island were close barriered and the paths were swept clean of all debris and material.

All in all, had it not been for everyone's (Dan and Robin included) hard work and professionalism then I doubt that we could have achieved this in the time scale available to us.

We very much appreciate this and I know the CBC client does too, having been on
site shortly after opening to see the works for himself. To say the least he was impressed!"

Steve Hall
Senior Engineer - Bedfordshire Highways